Editorial Disclosure: We may earn compensation when you contact companies through our site. This does not change our ratings. Advertiser disclosure | Ownership | Methodology

SACRAMENTO, CA SOLAR CONTRACT GUIDE

Sacramento Solar Panel Laws: SMUD's Rules and Your Exit Options

SMUD sets its own solar rate outside CPUC rules. How that, closed installers and California cancellation law affect a contract you want out of.

Independent editorial researchNot a law firm. Not legal advice.34 cited sources11 min read
On this page
  1. SMUD, Roseville or PG&E
  2. Why it matters for an exit
  3. If your installer went out of business
  4. California law, briefly
  5. Where to complain
  6. If you have a solar loan
  7. Permits, HOA, tax, sale
  8. Frequently Asked Questions
  9. Sources

Solar in Sacramento runs on different rules than most of California. SMUD, the community-owned utility for Sacramento County, is not governed by the California Public Utilities Commission, so the state's Solar Billing Plan does not apply to its customers.[2] Instead, homes approved for solar on or after March 1, 2022 are on SMUD's Solar and Storage Rate, which pays 9.6 cents per kWh for exported power at any hour, and older net metering customers keep that arrangement only until December 31, 2030.[1][2] If your installer has gone out of business, the utility rules still decide what your system is worth. Below: how to tell SMUD from Roseville Electric or PG&E, what to do when a Sacramento-area solar company closes, local complaint offices and loan exits.

SMUD, Roseville Electric or PG&E: who credits your solar

Start with the name on your electric bill. SMUD describes itself as Sacramento County's electric service, covering about 900 square miles, and is run by a locally elected Board of Directors.[3] Roseville has its own city utility, Roseville Electric, with its own solar process.[4] If your bill comes from PG&E, you are under CPUC rules instead. A proposal built on the wrong utility's rules will not match your bills.

SMUD: the Solar and Storage Rate

SMUD's Board, not the CPUC, sets its rates, and SMUD says proposed CPUC net metering changes do not affect them.[2] As of October 2026, SMUD states:[1][2]

  • New solar since March 1, 2022. Customers approved to install solar or storage on or after that date, and customers who move into a home with existing solar on or after that date, are on the Solar and Storage Rate, an add-on to SMUD's Time of Day (5 to 8 p.m.) Rate.
  • Export price. Excess solar is bought back at 9.6 cents per kWh, no matter the time of day or season. Monthly fixed charges, fees and taxes still apply.
  • Sizing. A system can be sized up to 110% of the last 12 months of use, or 120% with on-site battery storage.
  • Legacy net metering. Customers approved before March 1, 2022 can stay on net metering until December 31, 2030. Adding storage with SMUD incentives, modifying or replacing the system, or moving ends it.
  • Annual settlement on NEM. Legacy credits carry month to month within a 12-month settlement year; at the end you can take a payment for net surplus, roll the surplus kWh forward, or decline both.

To connect, the installer applies through SMUD's PowerClerk portal and pays a one-time interconnection fee; SMUD approves the application, the installer gets local permits and inspections, then SMUD installs the meter and issues Permission to Operate. SMUD requires a building permit for every installation and does not sell solar systems itself.[1]

Roseville Electric

Roseville Electric caps a home system at 100% of the most recent 12 months of use, issues an interconnection reservation valid for 120 days, and turns the system on only after a City inspection, a multi-register meter installation and a permit to operate from the utility. Its process page points to the City's municipal code for "Roseville Solar 2.0 or net metering" terms; we did not find a posted export rate, so ask Roseville Electric for yours.[4]

PG&E areas

PG&E customers who applied for interconnection on or after April 15, 2023 take service on the net billing tariff from CPUC Decision 22-12-056.[6] PG&E says NEM applications submitted before that date had to be completed before April 15, 2026 to keep NEM 2.0, and it describes Net Surplus Compensation as roughly 2 to 4 cents per kWh.[5] Our San Jose page covers PG&E billing in more detail.

Stuck in a solar contract in Sacramento?

Get matched with a solar exit company that may be able to help with your lease, PPA or loan.

100% freeNo obligationNot legal advice

Why SMUD's rules matter for an exit

Most solar disputes come back to promised savings. Sacramento has a few specific gaps to check against your paperwork:

  1. Net metering sold after March 1, 2022. A SMUD system approved on or after that date is on the Solar and Storage Rate, not net metering.[2] A projection that credited exports at your full retail rate would not match.
  2. Savings modeled past 2030. Legacy SMUD net metering ends December 31, 2030.[2] A 20 or 25-year savings table that kept net metering for the whole term rested on an assumption SMUD does not support.
  3. Oversizing. A design above 110% of your past use (120% with a battery) exceeds SMUD's sizing limit.[1]
  4. The buyer's surprise. If you bought a home with existing solar on or after March 1, 2022, SMUD puts you on the Solar and Storage Rate, even if the seller had net metering.[2]
  5. "SMUD pays you for power." Exports earn 9.6 cents per kWh as of October 2026.[1] Pitches that implied a profit from exports deserve a second look.

None of this proves a contract is unenforceable. It tells you what to raise with a California attorney. Background: our guide to net metering changes.

If your Sacramento-area solar company went out of business

A closed installer does not end the contract or the financing. What happens next depends on what you signed:

  • Owned system with a loan. The loan usually stays with the lender or a servicer, and payments continue. See the loan section below and who services my solar loan.
  • Lease or PPA. The system belongs to a financing company, and servicing often moves to a new company after a bankruptcy sale.
  • Project not finished. SMUD says that to replace a contractor mid-project you can contact SMUD Interconnection at Solar.PV@smud.org or 916-732-6420.[1] Check your permit status with the city or county before a new installer starts.

SunPower and SunStrong

SunPower, a California company with its principal office in Richmond at the time, filed Chapter 11 in Delaware on August 5, 2024 (Case No. 24-11649).[16] Complete Solaria agreed to buy parts of the business, including the dealer network.[17] SunStrong Management now lists SunPower among the originators whose lease, loan and PPA accounts it bills.[18] For SunPower owners asking about repairs and monitoring, including in Placer County, SunStrong says its SunStrong Connect app (formerly mySunPower) is available only to former SunPower customers, that basic monitoring is free, and that it offers paid help for repairs that are not covered.[19] Read your own warranty documents before paying for a repair. Connecticut's Attorney General opened an investigation into SunStrong in March 2026; that is an investigation, not a finding.[20]

CompanyWhat happenedWho handles it now
SunPowerChapter 11, August 2024.[16]SunStrong Management (lease, loan and PPA billing).[18]
SunnovaChapter 11 in 2025; assets sold.SunStrong Management took over legacy Sunnova systems.[21]
Freedom ForeverCalifornia installer; filed Chapter 11 on April 15, 2026 (No. 26-10522), converted to Chapter 7 liquidation.[22][23]A Chapter 7 trustee; claims go through the court.[24] Loans stay with your lender.

We found no public record of how many Sacramento-area homes any of these companies served, so we do not claim local activity for them. For the full list, see the solar company bankruptcy list, what to do if your solar company went bankrupt and SunPower contract cancellation.

CSLB's Solar Energy System Restitution Program is no longer accepting new claims, but CSLB still takes solar complaints through its own form.[7] A bankruptcy filing generally pauses lawsuits against the debtor, so ask a California attorney before filing a claim or suit.

California cancellation law, briefly

Our California solar panel laws guide covers state law in depth. For a Sacramento contract:

  • Rescinding in the first days. Civil Code Section 1689.6 lets a buyer cancel a home solicitation contract until midnight of the third business day after signing, or the fifth for a senior citizen, for contracts signed on or after January 1, 2021. Written notice is effective when mailed.[9] A senior citizen means 65 or older, and Saturdays count as business days.[10]
  • Leases too. In our assessment, a lease or PPA signed at your home is generally treated the same way during that window; after it, ending a lease usually means a buyout, a transfer at sale, or the lease's own terms. See the solar lease exit guide.
  • The disclosure page. Business and Professions Code Section 7169 requires the CSLB solar disclosure document on the front of every solar contract, including total cost with financing and your cancellation rights.[8]
  • Federal rule. The FTC Cooling-Off Rule (16 CFR Part 429) sets a 3-day window for covered sales at your home.[11]

Mechanics are in how to cancel a solar contract. Compare other California utilities on our San Jose and San Diego pages.

Checking a Sacramento installer before you sign

SMUD says a solar contractor should hold a C-10 (electrical) or C-46 (solar) license and recommends NABCEP-certified installers.[1] CSLB also accepts A and B licenses for photovoltaic work and says solar salespeople generally must be registered as Home Improvement Salespersons.[7] Look up the license on CSLB's site and confirm the proposal uses SMUD's current rate, not net metering.

Where Sacramento homeowners can complain

OfficeWhat it handles
Sacramento County District Attorney, Consumer UnitInvestigates and prosecutes unfair, fraudulent and dishonest business practices and receives consumer complaints. For problems with a contractor, it lists 916-874-6174 and an online consumer fraud complaint form.[13][14]
California Attorney GeneralStatewide consumer complaints against a business.[12]
Contractors State License BoardLicensing and workmanship; CSLB has a dedicated solar complaint form.[7]
SMUDRates, interconnection and billing. The CPUC does not set SMUD's rates; its Board does.[2] Interconnection: Solar.PV@smud.org or 916-732-6420.[1]
California Public Utilities CommissionPG&E billing or interconnection disputes not resolved with PG&E.[15]

Keep copies of what you send. A complaint does not pause your payments.

If you have a solar loan in Sacramento

Most homeowners we hear from are paying a solar loan, and a loan generally outlives the installer. The routes are about the debt:

  • Payoff. Ask the servicer on your statement, not the sales company, for a written payoff figure.
  • Refinance. Some owners fold the balance into a mortgage refinance; check prepayment terms first.
  • Sale of the home. The loan is usually paid at closing and any lien filing released.
  • Disputes. Where the seller arranged the loan, the FTC Holder Rule (16 CFR Part 433) generally lets you raise claims and defenses against the seller with the loan holder, typically capped at what you have paid.[25] That can matter when the installer is in liquidation.

Read how to get out of a solar loan for each route, and use who services my solar loan to find your current servicer. Mosaic loan servicing moved to Solar Servicing in September 2025;[26] see Mosaic solar loan. Sunnova customers should see Sunnova bankruptcy. Leases and PPAs differ because you do not own the equipment: see the solar PPA exit guide. Lender complaints can go to the CFPB.[27]

Important: We do not advise homeowners to stop making payments or breach contractual obligations. Missed payments can damage your credit and may add legal liability. Keep paying while you explore your options, and talk to a licensed attorney before you act.

No exit route is guaranteed, and results vary by individual situation. A licensed California attorney can tell you which route fits your contract.

See who can help with your solar contract

Share a few details and we will connect you with solar contract exit companies that may be able to help. We may earn compensation when you contact companies through our site. This does not change our ratings.

100% freeNo obligationNot legal advice

Permits, HOA, property tax and selling in Sacramento

City of Sacramento permits and SolarAPP+

The City of Sacramento accepts SolarAPP+ automated review for residential solar on one- and two-unit homes and ADUs, for licensed contractors only and not for ballasted systems. SolarAPP+ charges its own processing fee and City permit fees are separate. Whether through SolarAPP+ or standard plan review, the application must include a SMUD interconnection letter, and the City inspects the work.[28] Outside city limits, permits come from your county or city building department. If an installer closed mid-job, ask the permit office whether the permit was ever finaled.

HOA rules

Civil Code Section 714 voids HOA rules that effectively prohibit or restrict solar but allows reasonable restrictions; for photovoltaic systems, a rule is not reasonable if it adds more than $1,000 or cuts efficiency by more than 10%. An application not denied in writing within 45 days is generally deemed approved.[29]

Property tax

Revenue and Taxation Code Section 73 keeps an added solar system from being reassessed as new construction. As of October 2026 the exclusion stops applying to systems that do not qualify before January 1, 2027. SB 710 (2025) kept that date and confirmed that systems qualifying before it keep the exclusion until a change in ownership.[30][33] A 2026 bill to extend it, AB 2389, was held in committee in May 2026,[34] so we found no extension. The Sacramento County Assessor lists active solar energy systems among its new construction exclusions.[31] Placer County homes go to the Placer County Assessor.

Selling a Sacramento home with solar

Two SMUD points matter: a buyer moving in on or after March 1, 2022 goes onto the Solar and Storage Rate, so the seller's net metering history may not repeat,[2] and the Section 73 exclusion ends at the sale.[30] A SunPower or Sunnova lease will generally need to be assumed by the buyer through SunStrong or bought out (our inference from SunStrong billing those accounts). See selling a home with solar, transferring a solar lease and solar UCC lien removal.

Frequently Asked Questions: Solar Contracts in Sacramento

What should I do if my solar company in Sacramento went out of business?

Keep paying while you sort it out. Find who bills you now: SunStrong Management bills former SunPower lease, loan and PPA accounts.[18] Loans usually stay with the lender. If the job is unfinished, SMUD says to contact SMUD Interconnection at Solar.PV@smud.org or 916-732-6420 to replace the contractor.[1] You can also file with CSLB and, if the company is in bankruptcy, check the court's claims process.[7][24] A California attorney can advise on claims.

Does SMUD still offer net metering for solar?

Only for legacy customers. SMUD customers approved to install solar before March 1, 2022 can stay on net metering until December 31, 2030. Customers approved on or after that date, and anyone who moves into a home with solar on or after it, are on the Solar and Storage Rate, which pays 9.6 cents per kWh for exports as of October 2026.[1][2] SMUD is not covered by the CPUC's Solar Billing Plan.

Who repairs SunPower panels in Placer County now?

SunPower filed Chapter 11 in August 2024.[16] SunStrong Management now bills SunPower lease, loan and PPA accounts, offers the SunStrong Connect monitoring app to former SunPower customers and points owners to paid service for repairs that are not covered.[18][19] If you own the system, check your panel and inverter warranties first; manufacturer coverage may differ from installer workmanship coverage, which ended with the bankruptcy in most cases (our assessment).

How do I know which utility serves my Sacramento-area home?

Check the company named on your electric bill. SMUD describes its service area as Sacramento County, about 900 square miles.[3] Roseville has its own city utility, Roseville Electric, with its own solar process.[4] Other areas around Sacramento may be served by PG&E, which follows the CPUC's net billing tariff for systems that applied on or after April 15, 2023.[6] The utility decides which export credit your savings estimate should have used.

Can I cancel a solar contract or lease in California after signing?

Within the first days, usually yes. Civil Code Section 1689.6 lets you cancel a home solicitation contract until midnight of the third business day after signing, or the fifth if you are 65 or older; mailed notice counts when sent.[9][10] After that, a lease or loan generally ends only through payoff, buyout, transfer at sale or a dispute. See our cancel guide and ask a California attorney about your contract.

Do I need a solar panel attorney in Sacramento?

We are not a law firm and cannot give legal advice. For a contract, licensing or loan dispute, look for a California attorney who handles consumer protection or contract litigation. The State Bar of California lists certified lawyer referral services you can search by county, including the Sacramento area.[32] Bring your contract, the CSLB disclosure page, loan documents and SMUD bills. See our solar panel lawyer guide.

See who can help with your solar contract

Share a few details and we will connect you with solar contract exit companies that may be able to help. We may earn compensation when you contact companies through our site. This does not change our ratings.

100% freeNo obligationNot legal advice

Sources

Checked October 2026. Rates and programs change; confirm with the source before you rely on a number.

  1. SMUD, Solar for Your Home (Solar and Storage Rate export price, sizing limits, interconnection steps, contractor licenses, changing contractors)
  2. SMUD, Solar customers (Solar and Storage Rate from March 1, 2022; NEM until December 31, 2030; not governed by the CPUC)
  3. SMUD, Company Information (service area, accounts, elected Board)
  4. Roseville Electric Utility, Residential interconnection process
  5. PG&E, Getting started with solar (Permission to Operate, NEM2 deadline, Net Surplus Compensation)
  6. California Public Utilities Commission, Net Energy Metering and Net Billing (D.22-12-056)
  7. Contractors State License Board, Solar Smart (license classifications, HIS registration, solar complaint form, restitution program closed)
  8. California Business and Professions Code Section 7169, solar energy system disclosure document
  9. California Civil Code Section 1689.6, right to cancel home solicitation contracts
  10. California Civil Code Section 1689.5, definitions (business day, senior citizen)
  11. 16 CFR Part 429, Cooling-Off Rule (eCFR)
  12. California Attorney General, Consumer Complaint Against a Business/Company
  13. Sacramento County District Attorney, Consumer and Environmental Protection (Consumer Unit, FAQs, contact)
  14. Sacramento County District Attorney, Consumer Fraud Complaint Form
  15. California Public Utilities Commission, File a Complaint
  16. SunPower Corporation, Form 8-K reporting Chapter 11 filing, Case No. 24-11649 (August 2024; principal office Richmond, California)
  17. Solar Power World, SunPower files for Chapter 11 bankruptcy (August 6, 2024)
  18. SunStrong Management, Your account (billing by originator: SunPower, Sunnova, PosiGen, GoodLeap)
  19. SunStrong Management, Help Center (SunStrong Connect app for former SunPower customers, uncovered repairs)
  20. Connecticut Attorney General, investigation into SunStrong Management (March 17, 2026)
  21. Solar Power World, Acquisitions now complete, SunStrong in charge of legacy Sunnova systems (September 4, 2025)
  22. CourtListener, Freedom Forever LLC, Bankr. D. Del. No. 26-10522
  23. pv magazine USA, Freedom Forever bankruptcy converted to Chapter 7 liquidation (September 9, 2026)
  24. U.S. Bankruptcy Court, District of Delaware, Claims information
  25. 16 CFR Part 433, Preservation of Consumers' Claims and Defenses (FTC Holder Rule, eCFR)
  26. Forbright Bank, Solar Mosaic's loan servicing operations transition to Solar Servicing (September 22, 2025)
  27. CFPB, Submit a complaint
  28. City of Sacramento Community Development, Residential Solar (SolarAPP+ and standard review)
  29. California Civil Code Section 714, Solar Rights Act
  30. California Revenue and Taxation Code Section 73, active solar energy system new construction exclusion
  31. Sacramento County Assessor, Exclusions (new construction exclusions incl. active solar energy system)
  32. State Bar of California, Lawyer Referral Service (certified services, search by county)
  33. California State Board of Equalization, Legislative analysis of SB 710 (Blakespear), Chapter 328, Statutes of 2025 (October 7, 2025)
  34. CalMatters Digital Democracy, AB 2389 (Irwin), 2025-2026 session: held under submission in committee (May 14, 2026)

Disclaimer: This guide is for informational purposes only and is not legal advice. Laws, utility tariffs and programs change, and this information may not reflect the most current developments. Results vary by individual situation, contract terms and applicable law. We do not advise homeowners to stop making payments or breach contractual obligations. Always consult a qualified California attorney before taking legal action. We may earn compensation when you contact companies through our site. This does not change our ratings. See our Ownership Disclosure, Advertiser Disclosure, and Methodology.

Free, no obligation
Get matched with a solar exit company

Share a few details about your lease, PPA or loan and we will connect you with solar contract exit companies that may be able to help.

Get matched with an exit company
100% freeNo obligation
Get matchedNo cost, no obligation
Get started