Raleigh sits in Duke Energy Progress territory,[1] and in North Carolina the way a solar deal is structured matters as much as the price. A third-party solar lease is legal here only from a lessor that holds a certificate from the NC Utilities Commission, and the lease must meet a written checklist that includes a 3-business-day right to rescind.[8][9] Power purchase agreements, where you pay per kWh the panels produce, are not allowed for an outside company at all.[7] If you signed a Raleigh solar lease, start by checking it against that checklist.
Duke Energy Progress and how Raleigh solar is credited
Duke Energy Progress serves about 1.5 million customers in central and eastern North Carolina, Raleigh included.[1] A few addresses in and around Wake County may get power from an electric cooperative or a town system instead. The name on your bill settles it, and it decides who hears a billing complaint: co-op problems go to the Rural Electrification Authority, not the Public Staff.[5]
On Duke Energy Progress, your solar rider depends on when your interconnection application went in. The tariff sheets we opened in October 2026 show:
| Rider | Who it covers | Terms on the published sheet |
|---|---|---|
| Rider NM (legacy) | Applications received by September 30, 2023 | Closed to new customers. Existing customers may stay until December 31, 2026, then move automatically to Rider NMB. Unused credits are forfeited each May 31 on Duke Energy Progress.[4] |
| Rider NMB-2 (Net Metering Bridge) | A capped number of new customers each year, first come first served (43,500 kW AC for 2026) | Monthly netting, net excess credited at 3.40 cents/kWh, $0.62 per kW monthly Non-Bypassable Charge, $28 minimum bill. Closed to new participants on and after January 1, 2027; current participants keep it up to 15 years from the application date.[3] |
| Rider RSC-3 (Residential Solar Choice) | Everyone else, and all new applicants once NMB closes | Requires Schedule R-TOU-CPP (time of use with critical peak pricing). Netting runs inside each time-of-use period, net excess credited at 3.40 cents/kWh, $0.62 per kW Non-Bypassable Charge, $1.50 per kW Grid Access Fee above 15 kW, $28 minimum bill.[2] |
Interconnection and the meter
Before Duke Energy Progress credits a single export, the customer must sign an Interconnection Request and, where required, an Interconnection Agreement under the North Carolina Interconnection Procedures. Service is then read on one bi-directional meter, and system size is limited to the lesser of the home's estimated maximum monthly demand or 20 kW AC.[2] If your installer never filed the request, you may have been paying for panels that Duke never agreed to credit. Ask Duke for the date the request was accepted and the rider on your account.
Get matched with a solar exit company that may be able to help with your lease, PPA or loan.
Solar leasing in Raleigh: the rules a lease must follow
North Carolina allows third-party solar leases inside the territory of a large utility such as Duke Energy Progress, but only under Article 6B of Chapter 62.[6][7] Four points do most of the work in a lease dispute:
- A Commission certificate. No one may lease solar equipment without a certificate of authority from the NC Utilities Commission, and each leased system must be registered with the Commission.[9]
- No production-based payments. A lease made outside the program, or any agreement where your payments are based on the panels' electric output, makes the seller an unlicensed public utility. The output of a leased system belongs to the homeowner.[7]
- A written checklist. The lease must be signed and dated, printed in at least 12-point type, give you at least 3 business days to rescind, describe the equipment and an output guarantee, and separately list the total cost over the term, fees, and the number and amount of payments. Blank spaces at signing make it voidable at your option until installation.[8]
- Savings projections. If a lease or the marketing estimates your future bills, it must also show results with utility rates falling 5% a year and rising 5% a year, and you must separately acknowledge that rates and tax incentives can change.[8]
The law also caps all leased systems on a utility's network at 1% of its five-year average North Carolina retail peak demand, and the utility may refuse to connect a leased system beyond that cap.[7] A lessor that solicits without a certificate, or uses unfair or deceptive practices in leasing, faces civil penalties of up to $10,000 per occurrence.[9] Those penalties are enforced by the Commission, not paid to you, but a missing certificate or a missing disclosure is exactly the kind of fact a licensed North Carolina attorney will want to see.
If a Raleigh salesperson described your deal as paying "only for the power the panels make," read the contract closely. That structure is reserved to utilities in North Carolina, and it is worth an attorney's review.[7]
Why the Duke rules matter for a Raleigh exit
In our assessment, the Raleigh complaints that hold up best compare the written proposal with the tariff and the actual bills:
- "No more power bill." Both NMB and RSC carry a $28 monthly minimum on the customer and distribution part of the bill, and export credits do not count toward it.[2][3]
- Credits valued at retail. Net excess on the newer riders earns 3.40 cents/kWh on the sheets we read, far below what you pay for the energy you buy.[2] A proposal that valued every exported kWh at the retail price deserves a second look.
- Legacy net metering for decades. Rider NM ends for residential customers on December 31, 2026.[4]
- A 2026 tax credit. The federal Residential Clean Energy Credit is not available for property placed in service after December 31, 2025.[10]
Gather twelve months of bills, the rider shown on them, your monitoring app data and every page you signed. Billing or metering problems go first to Duke, then to the Public Staff's Consumer Services Division at 1-866-380-9816.[5]
North Carolina law for Raleigh contracts, in short
We found no Raleigh ordinance that adds a solar cancellation right. State and federal rules apply, and our North Carolina solar laws guide covers them in depth.
- Home-solicitation credit sales: you may cancel until midnight of the third business day after signing, by written notice to the seller's address in the agreement.[11] The agreement must include the cancellation statement and form.[12]
- FTC Cooling-Off Rule: 3 business days for most sales made at your home.[13]
- Leases: the separate 3-business-day rescission right in G.S. 62-126.6.[8]
- Chapter 75: G.S. 75-1.1 bars unfair or deceptive practices,[14] and G.S. 75-16 trebles damages in a successful private suit.[15]
For step-by-step cancellation, see how to cancel a solar contract. Homeowners in Duke Energy Carolinas territory should read our Charlotte solar laws page, and Tennessee readers can compare Nashville.
Where Raleigh homeowners can complain
| Office | Use it for |
|---|---|
| NC Department of Justice, Consumer Protection | Sales, lease and contract complaints against the installer or lessor.[16] The Public Staff lists its numbers as 1-877-566-7226 and 919-716-6000.[5] |
| NC Public Staff, Consumer Services | Duke Energy Progress billing, metering and interconnection disputes.[5] |
| NC Licensing Board for General Contractors | License checks and complaints; a state license is needed for projects of $40,000 or more.[17][18] |
| NC Board of Examiners of Electrical Contractors | Electrical contracting, which requires a state license at any job size.[19][20] |
| CFPB | Problems with a solar lender or loan servicer.[21] |
For a lease, also ask the lessor for its Utilities Commission certificate. If it cannot produce one, raise that with the Public Staff and in your Department of Justice complaint.[9] We did not find a City of Raleigh or Wake County office that handles solar contract complaints.
Installer failures that reached North Carolina
Power Home Solar, LLC, which did business as Pink Energy, filed Chapter 7 on October 7, 2022 in the Western District of North Carolina (No. 22-50228). The trustee reports 6,191 claims filed as of January 1, 2026 and expects no distribution until at least 2027.[23] The North Carolina Attorney General, investigating the company, led nine attorneys general in asking five lenders (Dividend Solar Finance, GoodLeap, Cross River Bank, Sunlight Financial and Solar Mosaic) to suspend payments and interest for customers without a working system.[22] That was a request during an investigation, not a court finding. See our Pink Energy bankruptcy guide.
In February 2024 the Department of Justice also warned Encor Solar customers that the company had closed, and told those who financed to contact their lender.[24]
We did not confirm which other failed installers sold in the Triangle. Match the legal name on your contract against our solar company bankruptcy list, and see the guides to Sunnova, SunPower, Freedom Forever, ADT Solar and Titan Solar. If your company is gone, start with what to do when a solar company goes bankrupt.
If you have a solar loan in Raleigh
Leases get the statute, but most homeowners who contact us are paying a solar loan, and the loan is its own contract with its own servicer. The usual routes:
- Pay it off with a written payoff quote from the current servicer.
- Refinance into a cheaper loan or a mortgage refinance.
- Sell the home and clear the balance and any filing at closing.
- Dispute it. Where the installer arranged the financing, the FTC Holder Rule (16 CFR Part 433) generally lets you raise claims against the seller as defenses against the lender, usually up to what you have paid.[25]
Loans often change hands. Look up your servicer with who services my solar loan. Mosaic loan servicing moved to Solar Servicing LLC in September 2025[26] (see Mosaic solar loan), and Sunnova customers should read Sunnova bankruptcy. Our how to get out of a solar loan guide walks through each option. A lease is a different animal; use the solar lease exit guide or, for a PPA signed elsewhere, the solar PPA exit guide.
Important: We do not advise homeowners to stop making payments or breach contractual obligations. Missed payments can damage your credit and may add legal liability. Keep paying while you explore your options, and talk to a licensed attorney before you act.
Results vary by individual situation, and no outcome is guaranteed. A licensed North Carolina attorney should read the loan or lease and the sales papers side by side.
Share a few details and we will connect you with solar contract exit companies that may be able to help. We may earn compensation when you contact companies through our site. This does not change our ratings.
Permits, HOA, property tax and selling in Raleigh
City of Raleigh solar permits
Raleigh says most residential rooftop systems qualify for same-day online permitting through its Permit Portal, though some projects get flagged for more review. Rooftop jobs on single-family homes need no site plan, the electrical permit rides on the residential permit, and a signed and sealed document from a design professional who inspected the site is required. Ground-mounted systems need a site plan. The Permit Helpline is 919-996-2500.[27] Ask the city whether your permit was finaled. We found no SolarAPP+ program in Raleigh.
HOA rules
G.S. 22B-20 voids covenants that would block residential solar, but an HOA may still bar panels visible from the ground on a facade or roof slope facing common or public areas.[28] Local development rules are limited in a similar way by G.S. 160D-914.[29]
Property tax
North Carolina excludes 80% of the appraised value of a solar energy electric system from property tax.[30] The Wake County Department of Tax Administration can tell you how it shows on your listing.[31]
Selling a home with solar
Owned panels go with the house, and a loan is usually paid at closing. A leased system is harder: the lease must disclose any third-party approval needed to transfer the lease or the property, with that party's contact details.[8] A fixture filing is recorded with the Wake County register of deeds; other financing statements go to the Secretary of State.[32] Read selling a home with solar and solar UCC lien removal.
Frequently Asked Questions: Solar Contracts in Raleigh
Can I lease solar panels in Raleigh, NC?
Yes, but only from a lessor holding a certificate from the NC Utilities Commission.[9] The lease must give at least 3 business days to rescind, list the total cost and every fee, and show bill estimates with rates falling and rising 5% a year.[8] A deal priced per kWh produced is not a legal lease for an outside company.[7] Before signing, ask for the certificate and read the separately acknowledged disclosures.
How do I get out of a solar panel lease in Raleigh?
Within 3 business days of signing, use the lease's rescission right.[8] After that, look for a missing disclosure, blank spaces at signing, a lessor without a Commission certificate, or deceptive sales claims under G.S. 75-1.1.[8][9][14] A buyout or a transfer to a home buyer may also be possible. See the solar lease exit guide and talk to a licensed North Carolina attorney.
What should I check before buying solar panels in Raleigh, NC?
Search the installer on the NC Licensing Board for General Contractors (projects of $40,000 or more) and the electrical contractors board.[17][19] Ask which Duke Energy Progress rider you will be on and what it pays for exports: 3.40 cents/kWh on the sheets we read, with a $28 minimum bill.[2] Confirm the city permit, and do not count the federal tax credit for a 2026 installation.[10]
What is the best solar cancellation service in Raleigh?
No company can promise to cancel a North Carolina solar contract, and results vary by individual situation. We are not a law firm. Compare solar exit companies on our ranking of solar cancellation companies, and for legal advice use the NC Bar Association Lawyer Referral Service, which offers a 30-minute first consultation for $50 (919-677-8574).[33] Look for a consumer protection attorney who handles Chapter 75 claims.
Does Duke Energy Progress still offer net metering in Raleigh?
Share a few details and we will connect you with solar contract exit companies that may be able to help. We may earn compensation when you contact companies through our site. This does not change our ratings.
Sources
Checked October 2026. Rates and programs change; confirm with the source before you rely on a number.
- Duke Energy, NC Utilities Commission approves Duke Energy Progress request to lower customer rates by 4.5% (December 2, 2024; service area includes Raleigh)
- Duke Energy Progress, Rider RSC-3 Residential Solar Choice, NC RR-37 (effective October 1, 2023; NCUC Docket E-100, Sub 180)
- Duke Energy Progress, Rider NMB-2 Net Metering Bridge, NC RR-36 (effective October 1, 2023; NCUC Docket E-100, Sub 180)
- NC Public Staff, Energy Division, Net Metering (legacy Rider NM closure and transfer dates)
- NC Public Staff, Consumer Services Division (utility complaints; co-ops go to the Rural Electrification Authority)
- N.C. Gen. Stat. 62-126.3, Definitions (Article 6B, customer generator lessee and electric generator lessor)
- N.C. Gen. Stat. 62-126.5, Scope of leasing program in offering utilities' service areas
- N.C. Gen. Stat. 62-126.6, Electric customer generator leasing requirements; disclosures; records
- N.C. Gen. Stat. 62-126.7, Commission authority over electric generator lessors
- Internal Revenue Service, Residential Clean Energy Credit
- N.C. Gen. Stat. 25A-39, Buyer's right to cancel (home-solicitation sales)
- N.C. Gen. Stat. 25A-40, Form of agreement or offer; statement of buyer's rights
- 16 CFR Part 429, Cooling-Off Rule (eCFR)
- N.C. Gen. Stat. 75-1.1, Unfair or deceptive acts or practices
- N.C. Gen. Stat. 75-16, Civil action by person injured; treble damages
- North Carolina Department of Justice, File a Consumer Complaint
- N.C. Gen. Stat. 87-1, General contractor defined ($40,000 threshold)
- North Carolina Licensing Board for General Contractors (license search and complaints)
- N.C. Gen. Stat. 87-43, Electrical contracting defined; licenses
- North Carolina State Board of Examiners of Electrical Contractors (license search and complaints)
- CFPB, Submit a complaint
- North Carolina Department of Justice, Attorney General Josh Stein Calls On Five Solar Lending Companies to Suspend Loan Payments and Interest for Pink Energy Customers (November 22, 2022)
- Chapter 7 Trustee Jimmy Summerlin, In re Power Home Solar, LLC d/b/a Pink Energy, Bankr. W.D.N.C. No. 22-50228 (case information page)
- North Carolina Department of Justice, Consumer Alert: Tips for Encor Solar Customers (February 9, 2024)
- 16 CFR Part 433, FTC Holder Rule (eCFR)
- Forbright Bank, Solar Mosaic's loan servicing operations transition to Solar Servicing (September 22, 2025)
- City of Raleigh, Residential Solar Photovoltaic (PV) System permits (same-day online permitting, Permit Helpline 919-996-2500)
- N.C. Gen. Stat. 22B-20, Deed restrictions and other agreements prohibiting solar collectors
- N.C. Gen. Stat. 160D-914, Solar collectors (local development regulations)
- N.C. Gen. Stat. 105-275, Property classified and excluded from the tax base (subdivision (45), solar energy electric systems)
- Wake County Department of Tax Administration
- N.C. Gen. Stat. 25-9-501, Filing offices (fixture filings)
- North Carolina Bar Association, Lawyer Referral Service ($50 for a 30-minute first consultation; 919-677-8574)
Disclaimer: This guide is for informational purposes only and is not legal advice. Laws, utility tariffs and programs change, and this information may not reflect the most current developments. Results vary by individual situation, contract terms and applicable law. We do not advise homeowners to stop making payments or breach contractual obligations. Always consult a qualified North Carolina attorney before taking legal action. We may earn compensation when you contact companies through our site. This does not change our ratings. See our Ownership Disclosure, Advertiser Disclosure, and Methodology.