LOS ANGELES, CA SOLAR CONTRACT GUIDE

Los Angeles Solar Panel Laws: LADWP vs SCE and Your Exit Options

How LADWP's net metering rider, SCE's Solar Billing Plan and CSLB license rules affect a solar contract you want out of, plus LA County resources.

Independent editorial researchNot a law firm. Not legal advice.28 cited sources11 min read
On this page
  1. LADWP vs SCE solar rules
  2. Why it matters for an exit
  3. Contractor license check
  4. California law, briefly
  5. Where to complain
  6. Bankrupt installers
  7. If you have a solar loan
  8. Permits, HOA, tax, sale
  9. Frequently Asked Questions
  10. Sources

In Los Angeles the first question is not what your contract says but who sends your electric bill. Inside the City of Los Angeles that is LADWP, a city department with its own net metering rider: excess solar is credited using your rate schedule's energy pricing, the credit carries forward, and any balance left when service ends is set to zero.[1] Homes served by Southern California Edison (SCE) that applied for solar after April 14, 2023 are on SCE's Solar Billing Plan, where exports earn hourly credits instead.[4] A savings projection built for one utility does not fit the other, and that gap is often where an LA solar dispute starts. Below: both utilities, license checks, local complaint offices and loan exits.

LADWP or SCE: which solar rules apply to your home

The name on your electric bill decides which rules apply. LADWP's rate ordinance covers customers within the incorporated limits of the City of Los Angeles (plus customers in Inyo and Mono counties).[1] Outside the city limits, LADWP's rules do not cover you even with an LA mailing address; your bill names your actual utility, often SCE.

LADWP: the city's own net metering rider

LADWP sets solar rules by its own ordinance, not CPUC tariffs. Under its Service Rider NEM, as posted in October 2026:[1]

  • If LADWP supplies at least as many kWh as you generate in a billing period, you pay for the net energy at your regular rate.
  • If you generate more, the credit is calculated using your rate schedule's energy pricing and applied to later bills, except taxes and minimum charges.
  • Credits apply only to the bill for the meter that measured the excess.
  • If a credit balance remains when you end service, it is adjusted to zero and LADWP owes no further compensation.

The rider is limited to systems of 1 MW or less.[1] To connect, the installer applies through LADWP's online system at ladwp.com/nem for an interconnection work request number; once the Los Angeles Department of Building and Safety (LADBS) finalizes the permit, it releases the project to LADWP for a solar inspection and net meter installation.[2][3] LADWP's guidelines say a system may not be operated, and may be locked, until all inspections are complete, any required interconnection agreement is signed and the net meter is installed.[2] LADWP's old Solar Incentive Program was discontinued.[2]

LADWP also limits how third-party systems are structured. Its NEM guidelines require a leased system to have a lease term of at least 10 years and an ownership option by the end of the term, and lease payments may not be based on the energy the system produces. Both parties file a Solar Lease Compliance Form, and the sale of energy by anyone other than LADWP is prohibited. For a noncompliant lease, LADWP may lock out the AC disconnect and remove the customer from NEM.[2]

SCE: the Solar Billing Plan

SCE is regulated by the California Public Utilities Commission. Since April 15, 2023, customers applying for interconnection have taken service under the net billing tariff adopted in CPUC Decision 22-12-056, which credits exports at a rate reflecting their value to the grid.[6] SCE calls this the Solar Billing Plan. As of October 2026, SCE says:[4][5]

  • Customers are on the TOU-D-PRIME rate, priciest on summer weekdays from 4 to 9 p.m.
  • Energy Export Credits vary by hour. For new customers, export values are locked for nine years based on the year service began; a buyer moving into a home that already has solar gets the current year's values.
  • Eligible residential customers who enroll before 2028 receive an extra credit of about $0.04 per kWh (about $0.09 for income-qualified customers).
  • Credits roll forward within an annual cycle; at the yearly settlement, credits for excess exports may be adjusted and surplus kWh earn Net Surplus Compensation at a wholesale rate.
  • Complete solar-only interconnection requests, including the final electrical permit, may get Permission to Operate within 10 business days.

Customers already on NEM keep it until their 20-year period ends. SCE also states that NEM 2.0 applicants deemed valid had until April 14, 2026 to submit final documents to keep NEM 2.0 eligibility.[4]

Stuck in a solar contract in Los Angeles?

Get matched with a solar exit company that may be able to help with your lease, PPA or loan.

100% freeNo obligationNot legal advice

Why the LADWP and SCE split matters for an exit

Most disputes come back to the savings promised at the sale. In Los Angeles, check these against your paperwork:

  1. The wrong utility in the proposal. SCE rates on an LADWP home, or the reverse, means the math used rules that do not apply to you.
  2. Net metering math on a newer SCE system. If your SCE application went in after April 14, 2023, or an older NEM 2.0 application missed SCE's April 14, 2026 final-document deadline, retail-rate net metering assumptions would not match the Solar Billing Plan.[4]
  3. A per-kWh contract on an LADWP home. LADWP's guidelines bar lease payments based on production and the sale of energy by anyone other than LADWP.[2] A PPA-style contract on an LADWP home is, in our assessment, a question for a California attorney.
  4. "Sell power back for cash." LADWP credits are applied to later bills and zeroed when service ends.[1] On SCE, surplus beyond your usage earns only Net Surplus Compensation at a wholesale rate.[4]

Background: our guide to net metering changes.

Checking a solar contractor's license in California

A common Los Angeles question is what license a solar installer needs. The Contractors State License Board (CSLB) lists several classifications that can legally install photovoltaic systems: A (general engineering), B (general building, because solar uses two unrelated trades), C-10 (electrical) and C-46 (solar).[7] CSLB says solar sales representatives generally must be registered as Home Improvement Salespersons unless the buyer started the negotiation at a fixed retail store.[7]

Three rules matter when you are unhappy with a contract:

  • The disclosure document. Business and Professions Code Section 7169 requires a CSLB solar energy system disclosure document on the front page of every solar contract, in boldface 16-point type, showing total cost and payments including financing, where to send complaints and your cancellation rights. The contract and disclosure must be in the language principally used in the sales presentation.[8]
  • Unlicensed work. Under Section 7031, a contractor generally cannot sue to collect payment for work that required a license unless it was licensed throughout the job, and a person who used an unlicensed contractor may sue to recover all compensation paid.[9]
  • Timing. CSLB addresses violations of contractor law for up to four years from the date of the act, but an investigation does not guarantee restitution.[10] CSLB's Solar Energy System Restitution Program is no longer accepting new claims.[7]

Look up the license number on your contract with CSLB's online license check and note its classification and status on the date you signed. CSLB also has a solar complaint form.[7]

California cancellation law, briefly

Our California solar panel laws guide covers state law in depth. The essentials:

  • 3 business days, or 5 for seniors. Civil Code Section 1689.6 lets a buyer cancel a home solicitation contract until midnight of the third business day after signing, or the fifth business day if the buyer is a senior citizen, for contracts signed on or after January 1, 2021.[11] A senior citizen is someone 65 or older, and a business day is any day except Sunday and listed holidays, so Saturdays count.[12]
  • Mailing works. Written notice is effective when deposited in the mail, properly addressed and postage prepaid, and it does not need to use the seller's form.[11]
  • Federal rule. The FTC Cooling-Off Rule (16 CFR Part 429) sets a similar 3-day window for covered sales made at your home.[13]

For step-by-step mechanics, see how to cancel a solar contract and the cooling-off period by state table. Compare our San Diego and Riverside pages.

Where Los Angeles homeowners can complain

OfficeWhat it handles
California Attorney GeneralConsumer complaints against a business, statewide.[14]
Contractors State License BoardLicensed and unlicensed contractor violations, including solar installers, for up to four years from the act.[10]
LA County Department of Consumer and Business AffairsCounty consumer office: file a complaint, request mediation, and get small claims help.[15]
California Public Utilities CommissionSCE billing or interconnection problems you could not resolve with SCE customer service.[16]
LADWP Connection CenterInterconnection and inspection status; its NEM guidelines list (213) 367-6937.[2] The CPUC does not set LADWP's rates.[1]

Keep copies of everything you send. A complaint does not pause your payments.

Bankrupt or exited installers with California ties

We found no public records tying a single bankruptcy to Los Angeles alone, so this list covers documented California companies.

CompanyWhat happenedWho handles it now
SunPowerCalifornia company (principal office in Richmond at filing). Filed Chapter 11 on August 5, 2024 in Delaware, Case No. 24-11649.[17]SunStrong Management lists SunPower among the originators whose lease, loan and PPA accounts it bills.[18] Connecticut opened an investigation into SunStrong in March 2026 (not a finding).[19]
Freedom ForeverTemecula, California installer. Filed Chapter 11 on April 15, 2026 in Delaware (No. 26-10522); converted to Chapter 7 liquidation.[20][21]A Chapter 7 trustee. Loans stay with your lender.
SunnovaFiled Chapter 11 in 2025 and sold its assets.SunStrong Management took over legacy Sunnova systems.[22]

For every company we track, see the solar company bankruptcy list and what to do if your solar company went bankrupt.

If you have a solar loan in Los Angeles

Most homeowners who contact us have a solar loan. It generally stays with the lender even if the installer is gone, so exits are about the debt:

  • Payoff. Ask the servicer named on your statement, not the sales company, for a written payoff figure.
  • Refinance. Some owners fold the balance into a mortgage refinance. Check prepayment terms first.
  • Sale of the home. The loan is usually paid at closing and any lien released.
  • Disputes. Where the seller arranged the financing, the FTC Holder Rule (16 CFR Part 433) generally lets you raise claims and defenses against the seller with the loan holder, typically capped at what you have paid.[23]

Our guide on how to get out of a solar loan covers each route. If Mosaic financed your system, see Mosaic solar loan. Leases and PPAs work differently because you do not own the equipment, and on LADWP homes they must also satisfy LADWP's lease rules above: see the solar lease exit guide and solar PPA exit guide. Lender complaints can go to the CFPB.[24]

Important: We do not advise homeowners to stop making payments or breach contractual obligations. Missed payments can damage your credit and may add legal liability. Keep paying while you explore your options, and talk to a licensed attorney before you act.

No exit route is guaranteed, and results vary by individual situation. A licensed California attorney can tell you which route fits your contract.

See who can help with your solar contract

Share a few details and we will connect you with solar contract exit companies that may be able to help. We may earn compensation when you contact companies through our site. This does not change our ratings.

100% freeNo obligationNot legal advice

Permits, HOA, property tax and selling in Los Angeles

LADBS permits

Inside the City of Los Angeles, LADBS issues express permits online, to contractors only, for rooftop photovoltaic systems on one- or two-family homes of 10 kW or less that meet listed electrical criteria, such as a 120/240-volt single-phase service and a panel rated no more than 225 amps. A separate building permit may be needed for structural support, and a paired battery system has its own criteria and needs Fire Department plan check approval.[25] LADWP connects a system only after LADBS finalizes the permit.[2]

HOA rules

Civil Code Section 714 voids covenants and HOA rules that effectively prohibit or restrict solar, while allowing reasonable restrictions. For photovoltaic systems, a restriction is not reasonable if it adds more than $1,000 to the cost or cuts efficiency by more than 10%. An HOA must decide in writing, and an application not denied in writing within 45 days is generally deemed approved.[26]

Property tax

Revenue and Taxation Code Section 73 excludes an active solar energy system from reassessment as new construction. As of October 2026 the section is set to expire on January 1, 2027; systems that qualify before then keep the exclusion until the property changes ownership.[27] Questions about how it was applied to your home go to the Los Angeles County Assessor.[28]

Selling a home with solar in LA

Three local points: an LADWP credit balance is zeroed when your service ends, so banked credits do not go to the buyer;[1] a buyer moving into an SCE home with solar gets the current year's export values rather than your locked ones;[5] and the Section 73 exclusion ends at a change in ownership.[27] See selling a home with solar, transferring a solar lease and removing a solar UCC lien.

Frequently Asked Questions: Solar Contracts in Los Angeles

What license does a solar contractor need in California?

CSLB lists four classifications that can install photovoltaic systems: A (general engineering), B (general building), C-10 (electrical) and C-46 (solar). Solar salespeople generally must be registered as Home Improvement Salespersons.[7] Check the license number on your contract with CSLB's online license check. If the installer was unlicensed, Business and Professions Code Section 7031 generally bars it from suing to collect and may let you recover what you paid; ask a California attorney.[9]

How do I know if I have LADWP or SCE?

Look at the company named on your electric bill. LADWP's rates apply to customers inside the incorporated City of Los Angeles, plus Inyo and Mono counties.[1] Some homes with a Los Angeles mailing address sit outside the city limits and are served by SCE or another utility. Your bill, not the solar proposal, settles it, and the answer decides which export rules your savings estimate should have used.

Does LADWP still offer net metering for solar?

Yes, as of October 2026 LADWP's posted rate ordinance includes a Net Energy Metering rider. When you produce more than you use in a billing period, the credit is calculated using your rate schedule's energy pricing and carried to later bills, but not against taxes or minimum charges. Any balance left when you end service is set to zero.[1] LADWP is not on the CPUC's Net Billing Tariff, so SCE rules do not apply.

What happens to my LADWP solar credits when I sell my house?

Under LADWP's NEM rider, a credit balance remaining when you terminate service is automatically adjusted to zero and LADWP owes no further compensation for excess generation.[1] In practice that means banked credits do not transfer to the buyer or get paid out to you. If your system is leased, the lease and LADWP's lease compliance paperwork also need to be handled in the sale.[2]

Can a senior in Los Angeles cancel a solar contract after 3 days?

Possibly. Civil Code Section 1689.6 gives a buyer who is 65 or older until midnight of the fifth business day after signing a home solicitation contract, instead of the third, for contracts signed on or after January 1, 2021.[11][12] Saturdays count as business days. Send written notice by mail and keep proof of mailing, and confirm your deadline with a California attorney.

See who can help with your solar contract

Share a few details and we will connect you with solar contract exit companies that may be able to help. We may earn compensation when you contact companies through our site. This does not change our ratings.

100% freeNo obligationNot legal advice

Sources

Checked October 2026. Rates and programs change; confirm with the source before you rely on a number.

  1. LADWP, Electric Rates Ordinance No. 180127 as amended, incl. Service Rider NEM (Net Energy Metering), as posted October 2026
  2. LADWP, Net Energy Metering Guidelines (revised 8/28/2019, modified 4/28/2021)
  3. LADWP, Self-Generation Incentive Program page (income-qualified solar and storage; interconnection at ladwp.com/nem)
  4. Southern California Edison, Solar Billing Plan FAQs
  5. Southern California Edison, Solar Billing Plan (how credits are valued, nine-year lock, settlement bill)
  6. California Public Utilities Commission, Net Energy Metering and Net Billing (D.22-12-056)
  7. Contractors State License Board, Solar Smart (license classifications, HIS registration, solar disclosure, complaint form)
  8. California Business and Professions Code Section 7169, solar energy system disclosure document
  9. California Business and Professions Code Section 7031, unlicensed contractors
  10. Contractors State License Board, Filing a Complaint
  11. California Civil Code Section 1689.6, right to cancel home solicitation contracts (as amended effective January 1, 2026)
  12. California Civil Code Section 1689.5, definitions (business day, senior citizen)
  13. 16 CFR Part 429, Cooling-Off Rule (eCFR)
  14. California Attorney General, Consumer Complaint Against a Business/Company
  15. Los Angeles County Department of Consumer and Business Affairs, Consumer Protection (file a complaint, request mediation)
  16. California Public Utilities Commission, File a Complaint
  17. SunPower Corporation, Form 8-K reporting Chapter 11 filing, Case No. 24-11649 (filed August 2024; principal office Richmond, California)
  18. SunStrong Management, Your account (billing by originator: SunPower, Sunnova and others)
  19. Connecticut Attorney General, investigation into SunStrong Management (March 17, 2026)
  20. CourtListener, Freedom Forever LLC, Bankr. D. Del. No. 26-10522
  21. pv magazine USA, Freedom Forever bankruptcy converted to Chapter 7 liquidation (September 9, 2026)
  22. Solar Power World, Acquisitions now complete, SunStrong in charge of legacy Sunnova systems (September 4, 2025)
  23. 16 CFR Part 433, Preservation of Consumers' Claims and Defenses (FTC Holder Rule, eCFR)
  24. CFPB, Submit a complaint
  25. LADBS, Information Bulletin P/GI 2020-003, Express Permits (rev. 5/28/2024), items 15 and 16 (photovoltaic and storage)
  26. California Civil Code Section 714, Solar Rights Act
  27. California Revenue and Taxation Code Section 73, active solar energy system new construction exclusion (as amended by SB 710, 2025)
  28. Los Angeles County Office of the Assessor

Disclaimer: This guide is for informational purposes only and is not legal advice. Laws, utility tariffs and programs change, and this information may not reflect the most current developments. Results vary by individual situation, contract terms and applicable law. We do not advise homeowners to stop making payments or breach contractual obligations. Always consult a qualified California attorney before taking legal action. We may earn compensation when you contact companies through our site. This does not change our ratings. See our Ownership Disclosure, Advertiser Disclosure, and Methodology.

Free, no obligation
Get matched with a solar exit company

Share a few details about your lease, PPA or loan and we will connect you with solar contract exit companies that may be able to help.